Last fall VertexRSI announced a reduction in lead-times from
60 to 45-days ARO for a number of 6.3-Meter antenna
configurations. We are now ready to reduce the lead-times for
the same configurations even further. We are encouraging customers
to call us with their requirements so that we can give our best
estimate for delivery, even on those products that have
traditional lead times greater than 45-60 days. Listed below
are latest details of the 6.3-Meter Antennas and their lead
times. |
 |
6.3KX120
ANTENNA & FEED SYSTEM (120° Azimuth in 1-segment):
C-Band:
5.850-6.425; 3.625-4.200 Ghz.
630101-1110 6.3M
C-Band 2-port CP RO (975-2298)................................from
45 to 30 days.
630101-2110 6.3M
C-Band 2-port LP RO (975-2474)................................from
45 to 30 days.
630101-1210 6.3M
C-Band 2-port CP TX/RX (975-2559)...........................from
45 to 30 days.
630101-2210 6.3M
C-Band 2-port LP TX/RX (975-2355)...........................from
45 to 30 days.
630101-1410 6.3M
C-Band 4-port CP TX/RX (975-2121)...........................from
45 to 30 days.
630101-2410 6.3M
C-Band 4-port LP TX/RX (975-2354)...........................from
45 to 30 days.
Ku-Band:
13.75-14.50; 10.95-12.75 Ghz.
630106-2220 6.3M
Ku-Band 2-port LP TX/RX (975-2748)..........................from
45 to 30 days.
630106-2410 6.3M
Ku-Band 4-port LP TX/RX (975-2723)..........................from
45 to 30 days.
6.3KX120 ANTENNA CONTROL SYSTEMS:
630300-13xx
7200ACU w/7150 MCUs & Servo Interface............................from
45 to 30 days.
630308-13xx
7134ACU w/7150 MCUs & Servo Interface............................from
45 to 30 days.
630311-13xx
7133ACU w/7133 MCUs C-Band 50Hz & Servo Intrfce.............from
45 to 30 days.
* ACS Kits include complete servo interface as required by
system.
6.3KX120 ACCESSORIES:
030599-01G Access
Ladder & Platform...................................................from
45 to 30 days.
630406-xx
Environmental Hubs Kits.......................................................
from 45 to 30 days.
630408-xx
Environmental Hubs Kits with heat..........................................from
45 to 30 days.
630411-01 Hub
Closeouts (Front & Rear)................................................from
45 to 30 days.
032566-02
Lightning Protection w/ down conductors................................from
45 to 30 days.
630282-xxxx
Transmit Axis Crossover; C-band, Single or Dual-run...............from
45 to 30 days.
630286-xxxx
Transmit Axis Crossover; Ku-band, Single or Dual-run..............from
45 to 30 days.
6.3KX120 ANTENNA DEICE SYSTEM
630350-xx 1230
systems.....................................................................call
for availability.
Note: Same delivery available for 6.3KX200 (200° Azimuth
in 2- 120°segments).
Please contact us for delivery on other configurations including,
but not limited to, painted pedestal mounts, painted reflector
back-up structure, special electrical configurations,
low-temperature options and/or high-wind options.
|